![road-work-2](https://dehayf5mhw1h7.cloudfront.net/wp-content/uploads/sites/2294/2016/06/06021914/road-work.webp)
(WORTH TOWNSHIP) — As part of the M-25 bridge replacement project over Mill Creek in Worth Township, MDOT has installed additional traffic signs along the posted detour route via M-90, Wildcat Road, and Galbraith Line. In an effort to maximize safety and traffic flow, temporary stop signs have been placed on M-90 at Wildcat Road and the intersection will function as a four-way stop for the duration of the project. Motorists will also see additional advanced notice of the four-way stop on M-90, including dual “stop” and “stop ahead” signs, rumble strips, barrels, and message boards. MDOT plans to reopen M-25 over Mill Creek in November.